The law that moves deadlines.
Short briefings of changes in the law that affect an investment's schedule and budget. Each is referenced to the text of the statute.
The environmental decision sets the order of the whole path. When it is required, which thresholds decide in typical investments and which decisions it must precede.
Read the section →- What must be settled for a PV farm with storage?
A photovoltaic farm above 1 MW goes through the local zoning plan, the environment, connection, the permit and the licence; storage adds its own thresholds. The order and deadlines are taken from the statute texts.
- What to agree before designing a site access?
Getting trucks to a biogas plant, a hall or a farm starts with a decision by the road authority and ends with choosing a pavement for the traffic. Step by step, with the legal basis.
- Which 2026 changes affect investments?
Four changes that in 2026 moved the schedules and budgets of energy and construction investments. Each is referenced to the statute text published in the Journal of Laws.
- Can a plant draw energy from its own source without the public grid?
The Energy Law provides for a direct line: straight from the generator to the customer. When it counts as a line under the Act, what is notified before construction and what duties follow.
- How long is an environmental decision valid and what to do when the deadline is running out?
Once obtained, an environmental decision does not wait for the investor indefinitely. When the deadline starts, how to extend it and what to check when buying land with a decision already in place.
- Is there still capacity to connect a source near the plot?
The grid operator must publish how much connection capacity for sources is left and who is in the queue. This is worth checking before buying a plot for a source.