A feedstock truck will not run on a promise.
Site access roads, junctions, manoeuvring yards and public roads. We design for real traffic, including heavy vehicles, and take the project through approvals with the road authority.
To decide again
Design traffic
Pavement is sized by the trucks.
Enter how many heavy vehicles a day the road will carry. We compute the design traffic under the GDDKiA catalogue of typical flexible and semi-rigid pavements, the traffic category and the minimum structure thickness for frost heave.
Scope of advice
- Traffic analysis and layout conceptBefore you fix the approach routes and the road layout
Type and number of vehicles, approach routes and load limits on roads in the area. The concept covers the access, internal road, manoeuvring yards and car parks checked against the movements of heavy vehicles.
- Site access junction and road authority agreementsWhen the investment needs a site access junction from a public road
The road authority's consent is often a condition of further decisions, so we establish its requirements before the design of the whole is drawn up. We see through the consent to the location of the junction and the agreements with the road authority.
- Pavement structureWhen heavy transport will serve the site
Traffic category, subgrade and selection of pavement layers matched to the actual traffic, so that the road does not need repair after the first season.
- Traffic organisationWhen the traffic organisation changes
We prepare the traffic organisation design and see it through approval.
- Drainage and lightingWhen the road and yards need drainage
Gradients, disposal of rainwater and site lighting.
- AcceptanceAt acceptance
We make sure layer and bearing-capacity tests are done before the road is covered with the next layer.
Where projects most often stall
- The road authority may refuse
The road authority may refuse permission for a site access junction or grant it for a limited period.
- A permit that lapses
Permission for a site access junction lapses if the junction is not built within 3 years of its issue.
Questions and answers
Does a junction require a zoning decision?
No. Building or rebuilding a junction on the basis of the road authority's permission does not require a zoning decision (WZ).
Is a junction built on a permit?
Junctions from national and voivodeship roads are built on notification, with 21 days for the voivode to object. In every case the road authority's permission for the junction location is required.
Does a private investor apply for a ZRID?
No. The decision permitting a road investment is issued by the voivode or the district head (starosta) on the application of the competent road authority, within 90 days. It applies to investments in public roads.
Check the path of your investment
The planner shows the order of decisions, the authorities and statutory deadlines for five types of investment.