ML AVIATION

Engineering advisory and design

Decide first. Then build.

For investments in Poland. We consider the site, the grid connection, access and the documentation together, before construction starts.

See what we settle Go to the tools

Change one assumption
Point at a layer to see the question we settle.

Investment review template

What must be settled before choosing a plot.

The plan, the grid connection and access shape the same decision.

A template of the method. No data from a specific investment.

  1. Location
    Input material
    Site location and plot numbers; an extract from the local zoning plan, or information that no such plan is in place.
    Question and dependency
    Is the proposed use compatible with the site's constraints? The answer informs the scope of further concept development.
    Next action
    Compare the planned use with the planning documents and list the gaps to clarify.
  2. Grid connection
    Input material
    Planned scale and technology; conditions and agreements already held.
    Question and dependency
    Which connection assumptions must be clarified before the design is developed? Capacity, route and deadlines are considered together.
    Next action
    Collect the connection documents and list the questions to settle with the operator.
  3. Access
    Input material
    Site location and proposed transport arrangements.
    Question and dependency
    Do the access assumptions match the planned traffic? The access layout shapes the site plan.
    Next action
    Check road access and identify the matters to be agreed with the road authority.